Skip to content
Contact us
Literature

Data Center pre-cooling and office air conditioning in the Peruvian desert

Contugas SAC

Data Center pre-cooling and office air conditioning in the Peruvian desert

The plant is composed by 5 ACF TK Gas Absorption Chillers for process applications, serving the air conditioning of the offices and the pre-cooling of the data center. 

Data Center pre-cooling and office air conditioning in the Peruvian desert

The GA ACF TK gas chiller has an extremely low electricity consumption: saving up to 88% of electricity compared to a traditional electrical system, no additional energy, no modification of electrical cabin.

Data Center pre-cooling and office air conditioning in the Peruvian desert

Data Center pre-cooling and office air conditioning in the Peruvian desert
  • Customer Contugas SAC
  • Products GA ACF TK
  • Application Terziary

Energy upgrade at the large-scale retail chain in northern Italy

Energy upgrade at the large-scale retail chain in northern Italy
  • Customer Carrefour
  • Products GAHP A, GA ACF ST, GAHP AR, AY, LINK
  • Application Terziary

Very low noise with the gas chiller-heaters in a medical centre

Very low noise with the gas chiller-heaters in a medical centre
  • Customer Kings Harbor Multicare Center
  • Products LINK, GA AYF
  • Application Terziary

Saving up to 87% of electricity in a church in New York

Saving up to 87% of electricity in a church in New York
  • Customer Grace Church
  • Products GA ACF ST
  • Application Terziary

New gas absorption heat pumps replaced older Servel chiller heater units

New gas absorption heat pumps replaced older Servel chiller heater units
  • Customer Southern Connecticut Gas Utility
  • Products GAHP AR
  • Application Terziary

Gas heating and cooling for a church in New York city

Gas heating and cooling for a church in New York city
  • Customer St. Agatha's Church
  • Products GA AYF
  • Application Terziary

Heating and cooling in a church in South Italy

Heating and cooling in a church in South Italy
  • Customer Chiesa del Carmine
  • Products GAHP AR
  • Application Terziary

Outdoor installation and no use of harmful refrigerants for a church in Hartford CT

Outdoor installation and no use of harmful refrigerants for a church in Hartford CT
  • Customer St. Patrick - St. Anthony Parish
  • Products GA ACF ST
  • Application Terziary

Gas-fired chiller-heaters for offices in Canadian British Columbia

Gas-fired chiller-heaters for offices in Canadian British Columbia
  • Customer Canadian Broadcasting Corporation
  • Products GA AYF
  • Application Terziary

Cooling with low electric energy consumption for a cultural centre

Cooling with low electric energy consumption for a cultural centre
  • Customer Jewish Home
  • Products GA ACF ST
  • Application Terziary

Multifunctional building with near-zero CO2 emissions in Australia

Multifunctional building with near-zero CO2 emissions in Australia
  • Customer Pixel Building
  • Products GAHP AR
  • Application Terziary

24% savings, reduction of polluting emissions and high efficiency all year round

24% savings, reduction of polluting emissions and high efficiency all year round
  • Customer Municipality in Milan
  • Products GAHP AR, LINK
  • Application Terziary

Energy-efficient, cost-effective and innovative solution: goal achieved

Energy-efficient, cost-effective and innovative solution: goal achieved
  • Customer Slupsk Technological Centre
  • Products GA ACF ST, GA ACF HR, AY
  • Application Terziary

High reliability for reversible gas absorption heat pumps in New Hampshire

High reliability for reversible gas absorption heat pumps in New Hampshire
  • Customer New Horizons for New Hampshire Inc.
  • Products GAHP AR
  • Application Terziary

Air source gas heat pump heating for a truck dealer

Air source gas heat pump heating for a truck dealer
  • Customer Scania Service Facility
  • Products GAHP A
  • Application Terziary

Hydrothermal gas heat pumps chosen for their very high efficiency in heating and cooling environments

Hydrothermal gas heat pumps chosen for their very high efficiency in heating and cooling environments
  • Customer GasTerra
  • Products GAHP W
  • Application Terziary

Air conditioning of a church: 30% saving on annual heating costs

Air conditioning of a church: 30% saving on annual heating costs
  • Customer Foglianise church
  • Products GAHP AR
  • Application Terziary

Gas-fired air-conditioning of a commercial space: up to 86% reduction in electricity requirements

Gas-fired air-conditioning of a commercial space: up to 86% reduction in electricity requirements
  • Customer Mitsubishi car dealer
  • Products GA ACF TK, AY
  • Application Terziary

Air conditioning with gas heat pumps for a Polish dealership: monitored efficiency

Air conditioning with gas heat pumps for a Polish dealership: monitored efficiency
  • Customer Mercedes Benz car dealer
  • Products GAHP AR, AY
  • Application Terziary