Skip to content
Contact us
Literature

Gas air conditioning for the offices of a large company

New York Department of Sanitation

Gas air conditioning for the offices of a large company

The project, comprised of two buildings situated along a common service road, houses the sanitation vehicle garage and maintenance facilities for the Brooklyn Community Districts 1 and 4, as well as the Borough Administrative Offices. These buildings also accommodate employee facilities, a salt storage shed, and parking areas.

Vehicular and pedestrian traffic circulation through the site and buildings is designed to facilitate the movement of a large number of trucks through the garages, while maintaining access to repair bays. Sanitation vehicles drive down the service road to access rear entrances of both garages. Once inside the garages, the trucks are stored, fueled, washed and repaired for the next day's activities.

The heating, ventilation and air conditioning system (HVAC) design requirements called for the induction of clean air at locations where personnel occupy the building, and for removal of the contaminated air away from the employees and near the areas where emissions are produced.

Gas air conditioning for the offices of a large company

The design effort focused not only on meeting and exceeding the client’s performance requirements, but also on minimizing energy use and simplifying the system’s components, operation, and maintenance. At the client’s request, the project avoided specifying overly complex and costly components, such as heat recovery features or fully automated control systems.

Four modes of the facility’s operation that called for different settings of the HV system were defined. The modes vary depending on the occupancy levels, presence or absence of running engines, and the quality of the indoor air. For each mode of the garage operation, there is a dedicated system setting that provides required environmental conditions while minimizing energy use.

This approach reduced both the first cost of the system and the energy consumption. The system consists of relatively simple and low-maintenance supply and exhaust fans that operate at different air exchange volumes, depending on the garage operation mode.
Major benefits:

  • Healthy and comfortable environment.
  • Optimize ventilation by directing clean air to occupants at 5’-0’’ level.
  • Low first cost.
  • Low energy use.
  • High reliability.
  • Minimize maintenance and service.

Area: 235,000 sq. ft - Conditioned & unconditioned space
Energy distribution system: Chilled water to air handling units
Unit number and type: 6 RTCF300 Modular Chillers – 75 Tons located on each building
Nominal cooling capacity: 1,800,000 Btu/hr – Nominal 150 Tons

Gas air conditioning for the offices of a large company

Gas air conditioning for the offices of a large company
  • Customer New York Department of Sanitation
  • Products ACF ST, gas chiller, Link integrated units
  • Application Public buildings

Replacing aging comfort conditioning equipment a gas fired heat pump

Replacing aging comfort conditioning equipment a gas fired heat pump
  • Customer Homeland Security
  • Products GAHP AR Plus, gas heat pump for heating or cooling
  • Application Public buildings

Gas cooling in a prestigious American university

Gas cooling in a prestigious American university
  • Customer University of Connecticut
  • Products ACF ST, gas chiller
  • Application Public buildings

Geothermal heat pumps for the University that cares about the environment

Geothermal heat pumps for the University that cares about the environment
  • Customer Open University
  • Products -
  • Application Public buildings

Highest BREEAM values achieved for an English university that has installed gas-fired heat pumps

Highest BREEAM values achieved for an English university that has installed gas-fired heat pumps
  • Customer University Church of England Academy
  • Products GAHP A Plus, gas heat pump for heating only
  • Application Public buildings

Replaced 33% of the heating system and achieved 73% efficiency improvement in school building

Replaced 33% of the heating system and achieved 73% efficiency improvement in school building
  • Customer Alighieri school complex
  • Products GAHP A Plus, gas heat pump for heating only
  • Application Public buildings

Cut operating costs by 39% and CO₂ emissions by 44% compared to older electric heat pumps

Cut operating costs by 39% and CO₂ emissions by 44% compared to older electric heat pumps
  • Customer Plaidt School
  • Products -
  • Application Public buildings

Public funding for the heating system due to high efficiency in the European Comprehensive Institute

Public funding for the heating system due to high efficiency in the European Comprehensive Institute
  • Customer Porg Ostrava Primary and Secondary School
  • Products GAHP A Plus, gas heat pump for heating only
  • Application Public buildings

Reliable 145% efficiency, even in Arctic cold (19° F)

Reliable 145% efficiency, even in Arctic cold (19° F)
  • Customer Sortland Primary School
  • Products GAHP A Plus, gas heat pump for heating only
  • Application Public buildings

Energy efficiency improvement of a Belgian school, without the need for back-up at low temperatures

Energy efficiency improvement of a Belgian school, without the need for back-up at low temperatures
  • Customer Gent Primary School
  • Products GAHP A Plus, gas heat pump for heating only
  • Application Public buildings

Retrofit with geothermal probes for the heating system in a school with 300 children

Retrofit with geothermal probes for the heating system in a school with 300 children
  • Customer Dolní Újezd Primary School
  • Products -
  • Application Public buildings

Geothermal heat pump for a German kindergarten: high performance to keep the toddlers warm

Geothermal heat pump for a German kindergarten: high performance to keep the toddlers warm
  • Customer Oberkochen Kindergarden
  • Products -
  • Application Public buildings